SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonHouse renovations

House renovations in Battersea

SK Developments designs, gets approval for and builds house renovations in Battersea and across Greater London, with one contract from the first drawing to the building control sign-off.

Guide price in Battersea

£1,150–£2,350 per m² for a medium to full renovation

In Battersea, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £103,500–£211,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a house renovation?

Renovated Victorian living room with a restored fireplace, sash windows and pine floorboards

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.

How much does a house renovation cost in Battersea?

In Battersea, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £103,500–£211,500. That range is adjusted for London, where domestic building work typically costs around 30% above the national average. Design, structural calculations and council fees are extra.

Guide prices for Battersea, including VAT at 20% (5% may apply to homes empty for two years or more)
Size or typeGuide range
Smaller project (63 m²)£72,500–£148,000
Typical project (90 m²)£103,500–£211,500
Larger project (126 m²)£145,000–£296,000
Rate per m²£1,150–£2,350

What moves the price most:

  • Whether you live in during the work
  • Structural and damp repairs
  • Extent of rewiring and replumbing
  • Finishes

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a house renovation in Battersea?

Before anything is built in Battersea, we confirm which approvals apply in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

Handled as part of most house renovations:

  • Decoration
  • Building control for notifiable work
  • Kitchens and bathrooms
  • Joinery, doors and floors
  • Rewiring and heating upgrades
  • Plastering and boarding

How long does it take?

Allow 8 to 20 weeks on site depending on scope. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.

Building in Battersea

Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.

We work across Battersea and neighbouring areas such as Wandsworth, Chelsea and Clapham. Postcodes we cover in Battersea include SW11.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about house renovations in Battersea

Do I need planning permission to renovate?

Internal work usually does not need planning permission unless the house is listed. External changes may.

Is VAT reduced on renovations?

Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.

How long does a house renovation take in Battersea?

Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.

Can I live in the house during a renovation?

For light work, yes. For a full renovation, most clients move out for some or all of the job.

How much does a house renovation cost in Battersea?

In Battersea, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £103,500–£211,500. Your fixed price depends on the survey and drawings.

Get a free, no-obligation home visit for your house renovation in Battersea.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price