House renovations in Bideford

Looking for a builder for a house renovation in Bideford? We design and build house renovations across Devon, covering postcodes such as EX39.

Guide price in Bideford

£900–£1,850 per m² for a medium to full renovation

In Bideford, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £81,000–£166,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a house renovation?

Renovated Victorian living room with a restored fireplace, sash windows and pine floorboards

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.

How much does a house renovation cost in Bideford?

In Bideford, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £81,000–£166,500. Building costs in the South West are close to the UK average, so the figures for Bideford are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Bideford, including VAT at 20% (5% may apply to homes empty for two years or more)
Size or typeGuide range
Smaller project (63 m²)£56,500–£116,500
Typical project (90 m²)£81,000–£166,500
Larger project (126 m²)£113,500–£233,000
Rate per m²£900–£1,850

The main things that change the cost:

  • Structural and damp repairs
  • Finishes
  • Windows and doors
  • Extent of rewiring and replumbing

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a house renovation in Bideford?

Whether you need planning permission depends on your house and its location in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

Handled as part of most house renovations:

  • Building control for notifiable work
  • Structural repairs and damp treatment
  • Plastering and boarding
  • Condition survey and scope of works
  • Joinery, doors and floors
  • Decoration

How long does it take?

Allow 8 to 20 weeks on site depending on scope. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Bideford

In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.

Bideford sits in Devon, about 36 miles north-west of Exeter. We cover the whole of Bideford, including postcodes EX39.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about house renovations in Bideford

Do you renovate listed buildings?

Yes, with listed building consent and appropriate materials.

Do I need planning permission to renovate?

Internal work usually does not need planning permission unless the house is listed. External changes may.

How long does a house renovation take in Bideford?

Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.

How much does a house renovation cost in Bideford?

In Bideford, a house renovation typically costs £900–£1,850 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £81,000–£166,500. Your fixed price depends on the survey and drawings.

Does a renovation need building regulations approval?

Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.

Tell us about your project in Bideford and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price