What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Bow?
In Bow, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £103,500–£211,500. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Bow. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £72,500–£148,000 |
| Typical project (90 m²) | £103,500–£211,500 |
| Larger project (126 m²) | £145,000–£296,000 |
| Rate per m² | £1,150–£2,350 |
The biggest cost drivers are:
- Finishes
- Windows and doors
- Extent of rewiring and replumbing
- Whether you live in during the work
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a house renovation in Bow?
Before anything is built in Bow, we confirm which approvals apply in England. In England internal renovation usually does not need planning permission unless the house is listed, when listed building consent covers internal work too. Notifiable work such as rewiring, structural changes, new windows and heating must meet building regulations.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Rewiring and heating upgrades
- Condition survey and scope of works
- Plastering and boarding
- Structural repairs and damp treatment
- Building control for notifiable work
- Joinery, doors and floors
How long does it take?
Allow 8 to 20 weeks on site depending on scope. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Bow
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
Projects in Bow (E3) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about house renovations in Bow
How long does a house renovation take in Bow?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
How much does a house renovation cost in Bow?
In Bow, a house renovation typically costs £1,150–£2,350 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £103,500–£211,500. Your fixed price depends on the survey and drawings.
Do you renovate listed buildings?
Yes, with listed building consent and appropriate materials.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
