What is a house renovation?

A house renovation brings an older or tired home up to date. It can include rewiring, a new heating system, replastering, new floors, windows, kitchens and bathrooms, and changes to the layout. A full renovation is often combined with an extension or loft conversion.
How much does a house renovation cost in Newtown?
In Newtown, a house renovation typically costs £850–£1,650 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). For a typical 90 m² project that is roughly £76,500–£148,500. We start from a UK-wide guide and adjust it for Wales, where labour and materials are typically about 8% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (63 m²) | £53,500–£104,000 |
| Typical project (90 m²) | £76,500–£148,500 |
| Larger project (126 m²) | £107,000–£208,000 |
| Rate per m² | £850–£1,650 |
What moves the price most:
- Extent of rewiring and replumbing
- Finishes
- Whether you live in during the work
- Structural and damp repairs
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a house renovation in Newtown?
Before anything is built in Newtown, we confirm which approvals apply in Wales. In Wales internal renovation usually does not need planning permission unless the house is listed. Notifiable work must meet building regulations.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical house renovation we handle:
- Building control for notifiable work
- Structural repairs and damp treatment
- Kitchens and bathrooms
- Plastering and boarding
- Condition survey and scope of works
- Joinery, doors and floors
How long does it take?
Expect 8 to 20 weeks on site depending on scope. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Newtown
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Projects in Newtown (SY16) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about house renovations in Newtown
How much does a house renovation cost in Newtown?
In Newtown, a house renovation typically costs £850–£1,650 per m² for a medium to full renovation, including VAT at 20% (5% may apply to homes empty for two years or more). A typical 90 m² project comes to roughly £76,500–£148,500. Your fixed price depends on the survey and drawings.
Can I live in the house during a renovation?
For light work, yes. For a full renovation, most clients move out for some or all of the job.
Does a renovation need building regulations approval?
Some parts do, such as rewiring, structural changes, new windows and heating systems. We handle notifications.
Is VAT reduced on renovations?
Usually not; the standard 20% rate applies. A reduced 5% rate can apply when renovating a home that has been empty for at least two years.
Do I need planning permission for a house renovation in Newtown?
In Wales internal renovation usually does not need planning permission unless the house is listed. Notifiable work must meet building regulations.
How long does a house renovation take in Newtown?
Typically 8 to 20 weeks on site depending on scope. Design and approvals beforehand usually take 6 to 12 weeks.