What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Newtown?
In Newtown, a single-storey extension typically costs £1,800–£2,650 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £36,000–£53,000. That range is adjusted for Wales, where domestic building work typically costs around 8% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £25,000–£37,000 |
| Typical project (20 m²) | £36,000–£53,000 |
| Larger project (28 m²) | £50,500–£74,000 |
| Rate per m² | £1,800–£2,650 |
The main things that change the cost:
- How much of the existing house is opened up
- Kitchen, flooring and finishes, which we can include or leave to you
- Glazing: sliding and bifold doors cost more than French doors
- Ground conditions and foundation depth
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Newtown?
Before anything is built in Newtown, we confirm which approvals apply in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a single-storey extension:
- Structural calculations for steels and lintels
- Knock-through to the existing house with steel beams
- Building control inspections and completion certificate
- Foundations, drainage and any build-over agreement
- Doors, windows and roof glazing installed
- First and second fix electrics, heating and plastering
How long does it take?
Expect 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Newtown
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Projects in Newtown (SY16) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Newtown
Who approves a single-storey extension in Newtown?
Planning matters in Newtown go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a single-storey extension cost in Newtown?
In Newtown, a single-storey extension typically costs £1,800–£2,650 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £36,000–£53,000. Your fixed price depends on the survey and drawings.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
Do I need planning permission for a single-storey extension in Newtown?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
