What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Oban?
In Oban, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500. Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £33,000–£51,000 |
| Typical project (28 m²) | £46,000–£71,500 |
| Larger project (39 m²) | £64,500–£99,500 |
| Rate per m² | £1,650–£2,550 |
Your quote will depend mainly on:
- Internal fit-out of the new rooms
- Single or two storeys
- Roof design and tile matching
- Drains, gas meters or soil pipes that need moving
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side extension in Oban?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Planning drawings and application
- Structural calculations
- Foundations and drainage alterations
- Building control completion
- Walls, roof and windows to match the house
- Opening into the existing house
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Oban
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Because Oban is a long way from the main centres, we confirm availability before quoting and list any travel costs separately.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side extensions in Oban
How much does a side extension cost in Oban?
In Oban, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £46,000–£71,500. Your fixed price depends on the survey and drawings.
Do I need planning permission for a side extension in Oban?
In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.
Who approves a side extension in Oban?
Planning matters in Oban go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.