SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonNew build homes

New build homes in Barnet

SK Developments builds new build homes in Barnet and across Greater London, working with plot owners and developers from feasibility to completion.

Guide price in Barnet

£2,600–£4,150 per m² of floor area (build cost)

In Barnet, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Barnet?

In Barnet, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Barnet. Design, structural calculations and council fees are extra.

Guide prices for Barnet, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£273,000–£436,000
Typical project (150 m²)£390,000–£622,500
Larger project (210 m²)£546,000–£871,500
Rate per m²£2,600–£4,150

Your quote will depend mainly on:

  • Size and complexity of the house
  • Services connections
  • External works and landscaping
  • Ground conditions and foundations

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a new build home in Barnet?

Before anything is built in Barnet, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

What we take care of:

  • Site appraisal and feasibility
  • Groundworks, foundations and drainage
  • Internal fit-out and finishes
  • Superstructure, roof and windows
  • Mechanical and electrical installation
  • Structural and services design

How long does it take?

Allow 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.

Building in Barnet

Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.

Barnet sits in Greater London, about 10 miles north of central London. We cover the whole of Barnet, including postcodes EN5.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about new build homes in Barnet

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

Do you build new build homes in Barnet?

Yes. We build new build homes across Barnet, including postcodes EN5. Every project starts with a free home visit.

How much does a new build home cost in Barnet?

In Barnet, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £390,000–£622,500. Your fixed price depends on the survey and drawings.

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

What warranty will a new home need?

Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.

Start with a guide price, then book a free survey for a fixed quote in Barnet.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price