What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Mill Hill?
In Mill Hill, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Mill Hill. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £273,000–£436,000 |
| Typical project (150 m²) | £390,000–£622,500 |
| Larger project (210 m²) | £546,000–£871,500 |
| Rate per m² | £2,600–£4,150 |
The main things that change the cost:
- Ground conditions and foundations
- Specification and energy systems
- Size and complexity of the house
- Services connections
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a new build home in Mill Hill?
Here is how the rules work for a new build home in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Structural and services design
- Mechanical and electrical installation
- Design and planning application
- Internal fit-out and finishes
- Superstructure, roof and windows
- Building control completion and warranty liaison
How long does it take?
Allow 9 to 14 months on site for a typical house. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Mill Hill
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
Mill Hill sits in Greater London, about 9 miles north-west of central London. We cover the whole of Mill Hill, including postcodes NW7.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about new build homes in Mill Hill
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
What warranty will a new home need?
Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.
How much does a new build home cost in Mill Hill?
In Mill Hill, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £390,000–£622,500. Your fixed price depends on the survey and drawings.
Who approves a new build home in Mill Hill?
Planning matters in Mill Hill go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.