What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Bow?
In Bow, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £390,000–£622,500. We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £273,000–£436,000 |
| Typical project (150 m²) | £390,000–£622,500 |
| Larger project (210 m²) | £546,000–£871,500 |
| Rate per m² | £2,600–£4,150 |
What moves the price most:
- Site access and demolition
- Specification and energy systems
- Ground conditions and foundations
- Services connections
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a new build home in Bow?
Approvals for a new build home in Bow follow the rules for England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a new build home:
- Design and planning application
- Site appraisal and feasibility
- Groundworks, foundations and drainage
- Mechanical and electrical installation
- Internal fit-out and finishes
- Building control completion and warranty liaison
How long does it take?
Expect 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.
Building in Bow
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
If your home is in Bow or close by in Stratford, Hackney and Leyton, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Bow
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
How much does a new build home cost in Bow?
In Bow, a new build home typically costs £2,600–£4,150 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £390,000–£622,500. Your fixed price depends on the survey and drawings.
How long does a new build home take in Bow?
Typically 9 to 14 months on site for a typical house. Design and approvals beforehand usually take 4 to 9 months.
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
Do I need planning permission?
Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).