What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Hawarden?
In Hawarden, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £660,000–£1,000,000. The guide for Hawarden reflects typical costs in Wales, roughly 8% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £462,000–£700,000 |
| Typical project (400 m²) | £660,000–£1,000,000 |
| Larger project (560 m²) | £924,000–£1,400,000 |
| Rate per m² | £1,650–£2,500 |
Your quote will depend mainly on:
- Number and size of homes
- Specification
- Planning conditions and obligations
- Site access and phasing
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a small housing development in Hawarden?
Whether you need planning permission depends on your house and its location in Wales. In Wales small schemes need full planning permission and, for most new buildings, sustainable drainage approval from the SuDS approval body. New homes must have sprinklers.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Pre-construction cost plan
- Groundworks, roads and drainage
- Handover packs for each home
- Utility connections
- External works and landscaping
- House construction to building regulations
How long does it take?
Build time is typically 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Hawarden
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Our Hawarden coverage includes postcode districts CH5, and we also work in nearby places such as Deeside, Buckley and Flint.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Hawarden
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
How long does a small housing development take in Hawarden?
Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.
How much does a small housing development cost in Hawarden?
In Hawarden, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £660,000–£1,000,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a small housing development in Hawarden?
In Wales small schemes need full planning permission and, for most new buildings, sustainable drainage approval from the SuDS approval body. New homes must have sprinklers.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.