SK Developments Free home visit0800 088 6248 Get a quote

CambridgeshireNew build homes

New build homes in March

SK Developments builds new build homes in March and across Cambridgeshire, working with plot owners and developers from feasibility to completion.

Guide price in March

£2,100–£3,400 per m² of floor area (build cost)

In March, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £315,000–£510,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in March?

In March, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £315,000–£510,000. That range is adjusted for the East of England, where domestic building work typically costs around 6% above the national average. Design, structural calculations and council fees are extra.

Guide prices for March, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£220,500–£357,000
Typical project (150 m²)£315,000–£510,000
Larger project (210 m²)£441,000–£714,000
Rate per m²£2,100–£3,400

The main things that change the cost:

  • External works and landscaping
  • Services connections
  • Size and complexity of the house
  • Ground conditions and foundations

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a new build home in March?

Before anything is built in March, we confirm which approvals apply in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

On a typical new build home we handle:

  • Structural and services design
  • Superstructure, roof and windows
  • Site appraisal and feasibility
  • Building control completion and warranty liaison
  • Mechanical and electrical installation
  • Design and planning application

How long does it take?

Allow 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in March

Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.

We work across March and neighbouring areas such as Wisbech, Ely and Peterborough. Postcodes we cover in March include PE15.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about new build homes in March

How much does a new build home cost in March?

In March, a new build home typically costs £2,100–£3,400 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £315,000–£510,000. Your fixed price depends on the survey and drawings.

Is Community Infrastructure Levy payable?

In areas with CIL, new homes may be liable. Self-builders can apply for an exemption before work starts.

Do I need planning permission?

Yes. A new dwelling always needs full planning permission (or permission in principle followed by technical details consent in England).

Do you build new build homes in March?

Yes. We build new build homes across March, including postcodes PE15. Every project starts with a free home visit.

What warranty will a new home need?

Lenders usually require a structural warranty or a professional consultant’s certificate. The warranty is arranged before work starts, and the provider inspects the build at key stages.

Start with a guide price, then book a free survey for a fixed quote in March.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price