SK Developments Free home visit0800 088 6248 Get a quote

CambridgeshireArchitectural design and drawings

Architectural design and drawings in March

Need architectural drawings in March? We survey the house, prepare the drawings with the architectural technicians we work with and coordinate the structural calculations.

Guide price in March

£1,500–£4,750 for planning and building regulations drawings for a typical extension

In March, a set of architectural drawings typically costs £1,500–£4,750 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a set of architectural drawings?

Extension drawings and a floor plan on a desk with a scale ruler and a white model house

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.

How much does a set of architectural drawings cost in March?

In March, a set of architectural drawings typically costs £1,500–£4,750 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for the East of England, where labour and materials are typically about 6% above average. Council application fees are extra.

Guide prices for March, including VAT at 20% (standard rate)
Size or typeGuide range
Planning and building regulations drawings for a typical extension£1,500–£4,750
Larger or more complex projects£4,750–£6,000

The biggest cost drivers are:

  • Planning or building regulations stage
  • Measured survey complexity
  • Number of design options
  • Project size and complexity

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Planning and building regulations in March

Here is how the rules work for a set of architectural drawings in England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

Handled as part of most architectural drawings:

  • Structural calculations coordinated
  • Measured survey of the existing house
  • Design options and sketch layouts
  • 3D views on request
  • Party wall drawings where needed
  • Tender-ready drawing pack

How long does it take?

Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.

Building in March

Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.

We work across March and neighbouring areas such as Wisbech, Ely and Peterborough. Postcodes we cover in March include PE15.

How it works

  1. 01

    Survey and brief

    We visit, talk through what you want and record the existing building.

  2. 02

    Concept design

    Options for layout and appearance, revised until you are happy.

  3. 03

    Drawings and documents

    The drawings and forms the council and building control need.

  4. 04

    Submission and follow-up

    We submit the application and deal with questions from the council or building control.

Questions about architectural drawings in March

Do you prepare architectural drawings in March?

Yes. We prepare architectural drawings across March, including postcodes PE15. Every project starts with a free home visit.

Can I use the drawings with another builder?

Yes. Drawings you pay for are yours to use for the project.

What drawings are needed for planning?

Usually existing and proposed floor plans and elevations, a block plan and a location plan. Some councils need more.

How long do drawings take?

Typically 2 to 6 weeks from survey, depending on revisions.

How much does a set of architectural drawings cost in March?

In March, a set of architectural drawings typically costs £1,500–£4,750 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Ready to talk about a set of architectural drawings in March? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price