Small housing developments in March

SK Developments builds small housing developments in March and across Cambridgeshire, working with plot owners and developers from feasibility to completion.

Guide price in March

£1,900–£2,850 per m² of floor area (build cost)

In March, a small housing development typically costs £1,900–£2,850 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £760,000–£1,140,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a small housing development?

Small development of brick semi-detached houses around a block-paved cul-de-sac

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.

How much does a small housing development cost in March?

In March, a small housing development typically costs £1,900–£2,850 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £760,000–£1,140,000. We start from a UK-wide guide and adjust it for the East of England, where labour and materials are typically about 6% above average. Design, structural calculations and council fees are extra.

Guide prices for March, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (280 m²)£532,000–£798,000
Typical project (400 m²)£760,000–£1,140,000
Larger project (560 m²)£1,064,000–£1,596,000
Rate per m²£1,900–£2,850

Your quote will depend mainly on:

  • Specification
  • Planning conditions and obligations
  • Number and size of homes
  • Site access and phasing

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a small housing development in March?

Approvals for a small housing development in March follow the rules for England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

What we take care of:

  • Groundworks, roads and drainage
  • Utility connections
  • Warranty and building control inspections
  • House construction to building regulations
  • Pre-construction cost plan
  • Design development and discharge of conditions

How long does it take?

Allow 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.

Building in March

Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.

Projects in March (PE15) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about small housing developments in March

Do you work with landowners?

Yes. If you own land, with or without planning permission, we can discuss building on it with you.

How long does a small housing development take in March?

Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.

How much does a small housing development cost in March?

In March, a small housing development typically costs £1,900–£2,850 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £760,000–£1,140,000. Your fixed price depends on the survey and drawings.

What about biodiversity net gain?

In England, biodiversity net gain rules apply to many developments, with exemptions for some small sites. We work with your ecologist to confirm what applies to your scheme.

Who handles road adoption?

We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.

Ready to talk about a small housing development in March? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.