What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Camberley?
In Camberley, an orangery typically costs £2,700–£3,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £43,000–£61,000. Building costs in the South East run about 12% above the UK average, and the figures for Camberley are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £29,500–£42,000 |
| Typical project (16 m²) | £43,000–£61,000 |
| Larger project (22 m²) | £59,500–£83,500 |
| Rate per m² | £2,700–£3,800 |
The main things that change the cost:
- Heating and flooring
- Amount and type of glazing
- Lantern size
- Size and shape of the footprint
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for an orangery in Camberley?
Approvals for an orangery in Camberley follow the rules for England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical orangery we handle:
- French, sliding or bifold doors
- Electrics, heating and plastering
- Flooring and decoration options
- Building control sign-off where required
- Roof lantern and glazed panels
- Insulated perimeter roof with internal pelmet
How long does it take?
Build time is typically 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Camberley
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
From GU15 outwards, we take on projects throughout Camberley and the surrounding parts of Surrey.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about orangeries in Camberley
How much does an orangery cost in Camberley?
In Camberley, an orangery typically costs £2,700–£3,800 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £43,000–£61,000. Your fixed price depends on the survey and drawings.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
How long does an orangery take in Camberley?
Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
Does an orangery need planning permission?
The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
