What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Farnborough?
In Farnborough, an orangery typically costs £2,700–£3,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £43,000–£61,000. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £29,500–£42,000 |
| Typical project (16 m²) | £43,000–£61,000 |
| Larger project (22 m²) | £59,500–£83,500 |
| Rate per m² | £2,700–£3,800 |
The biggest cost drivers are:
- Frame material and colour
- Lantern size
- Opening into the house
- Heating and flooring
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Farnborough?
Before anything is built in Farnborough, we confirm which approvals apply in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on an orangery:
- Roof lantern and glazed panels
- Foundations and dwarf walls or piers
- Building control sign-off where required
- French, sliding or bifold doors
- Flooring and decoration options
- Insulated perimeter roof with internal pelmet
How long does it take?
Build time is typically 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Farnborough
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
From GU11 outwards, we take on projects throughout Farnborough and the surrounding parts of Hampshire.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about orangeries in Farnborough
How much does an orangery cost in Farnborough?
In Farnborough, an orangery typically costs £2,700–£3,800 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £43,000–£61,000. Your fixed price depends on the survey and drawings.
Does an orangery need planning permission?
The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
How long does an orangery take in Farnborough?
Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.