What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Yateley?
In Yateley, an orangery typically costs £2,700–£3,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £43,000–£61,000. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Yateley. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £29,500–£42,000 |
| Typical project (16 m²) | £43,000–£61,000 |
| Larger project (22 m²) | £59,500–£83,500 |
| Rate per m² | £2,700–£3,800 |
What moves the price most:
- Size and shape of the footprint
- Opening into the house
- Frame material and colour
- Lantern size
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for an orangery in Yateley?
Here is how the rules work for an orangery in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Design to suit the style of the house
- Flooring and decoration options
- Electrics, heating and plastering
- Foundations and dwarf walls or piers
- French, sliding or bifold doors
- Roof lantern and glazed panels
How long does it take?
The build itself usually takes 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Yateley
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Yateley sits in Hampshire, about 10 miles south-east of Reading. We cover the whole of Yateley, including postcodes GU46.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about orangeries in Yateley
Do you build orangeries in Yateley?
Yes. We build orangeries across Yateley, including postcodes GU46. Every project starts with a free home visit.
How much does an orangery cost in Yateley?
In Yateley, an orangery typically costs £2,700–£3,800 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £43,000–£61,000. Your fixed price depends on the survey and drawings.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
Does an orangery need planning permission?
The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.