What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Dundee?
In Dundee, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £37,500–£53,000. Building costs in Scotland are close to the UK average, so the figures for Dundee are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £26,000–£36,500 |
| Typical project (16 m²) | £37,500–£53,000 |
| Larger project (22 m²) | £51,500–£72,500 |
| Rate per m² | £2,350–£3,300 |
What moves the price most:
- Size and shape of the footprint
- Frame material and colour
- Opening into the house
- Lantern size
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for an orangery in Dundee?
The approval route for Dundee is set by planning law in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Building control sign-off where required
- Design to suit the style of the house
- Roof lantern and glazed panels
- Insulated perimeter roof with internal pelmet
- Flooring and decoration options
- French, sliding or bifold doors
How long does it take?
Build time is typically 8 to 12 weeks on site. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Dundee
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
From DD1 outwards, we take on projects throughout Dundee and the surrounding parts of Tayside.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about orangeries in Dundee
What is the difference between an orangery and a conservatory?
An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.
How much does an orangery cost in Dundee?
In Dundee, an orangery typically costs £2,350–£3,300 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £37,500–£53,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for an orangery in Dundee?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
Do you build orangeries in Dundee?
Yes. We build orangeries across Dundee, including postcodes DD1. Every project starts with a free home visit.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.