What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Gateshead?
In Gateshead, an orangery typically costs £2,150–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £34,500–£49,000. Building costs in the North East run about 10% below the UK average, and the figures for Gateshead are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £23,500–£33,500 |
| Typical project (16 m²) | £34,500–£49,000 |
| Larger project (22 m²) | £47,500–£67,000 |
| Rate per m² | £2,150–£3,050 |
Your quote will depend mainly on:
- Size and shape of the footprint
- Frame material and colour
- Opening into the house
- Lantern size
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Gateshead?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical orangery we handle:
- Flooring and decoration options
- Design to suit the style of the house
- French, sliding or bifold doors
- Building control sign-off where required
- Electrics, heating and plastering
- Insulated perimeter roof with internal pelmet
How long does it take?
Allow 8 to 12 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Gateshead
Across the North East, colliery-era terraces and newer estates sit side by side, so the right project depends on the house type.
Gateshead sits in Tyne and Wear. We cover the whole of Gateshead, including postcodes DH98, NE8, NE82 and NE83.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about orangeries in Gateshead
Can an orangery replace a conservatory?
Yes. We can remove an old conservatory and build an orangery on new or upgraded foundations.
Does an orangery need planning permission?
The same rules as a single-storey extension apply. Many are permitted development, depending on depth, height and your house’s location.
How long does an orangery take in Gateshead?
Typically 8 to 12 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
How much does an orangery cost in Gateshead?
In Gateshead, an orangery typically costs £2,150–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £34,500–£49,000. Your fixed price depends on the survey and drawings.
Can it be used all year?
Yes. With an insulated roof, efficient glazing and heating, an orangery is comfortable all year.
