What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Gateshead?
In Gateshead, a structural alteration typically costs £4,000–£8,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Prices across the North East are typically 10% below the UK average for this kind of work, which is reflected in the range for Gateshead. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £4,000–£8,500 |
| Higher specification | £8,500–£10,500 |
Your quote will depend mainly on:
- Party wall involvement
- Span of the opening
- Floor and ceiling repairs
- Moving radiators, sockets and pipes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a structural alteration in Gateshead?
Whether you need planning permission depends on your house and its location in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical structural alteration we handle:
- Building control application
- Fire protection to the steel
- Structural engineer’s calculations and drawings
- Temporary propping
- Steel beam supply and installation on padstones
- Building control sign-off
How long does it take?
Build time is typically 1 to 2 weeks on site for a typical knock-through. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Gateshead
The North East has many terraced streets and post-war semis, where rear extensions and loft conversions are popular ways to gain space.
From DH98 outwards, we take on projects throughout Gateshead and the surrounding parts of Tyne and Wear.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about structural alterations in Gateshead
How much does a structural alteration cost in Gateshead?
In Gateshead, a structural alteration typically costs £4,000–£8,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How long does a structural alteration take in Gateshead?
Typically 1 to 2 weeks on site for a typical knock-through. Design and approvals beforehand usually take 6 to 12 weeks.
What fire protection does a steel need?
Usually fire-rated plasterboard or intumescent paint, as building control requires.
Can the beam be hidden?
Often, by setting it within the ceiling depth. It depends on the joists and span.
Do I need a party wall notice?
In England and Wales, if the beam sits in a party wall, yes.
