What is a porch?

A porch is a small extension built around the front door, giving a lobby for coats and shoes and stopping draughts reaching the hall. Most are brick with a pitched tiled roof to match the house, though glazed and timber porches are also common.
How much does a porch cost in Canterbury?
In Canterbury, a porch typically costs £7,250–£18,000 from a 3 m² porch to a small front extension, including VAT at 20% (standard rate). That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| From a 3 m² porch to a small front extension | £7,250–£18,000 |
| Higher specification | £18,000–£22,500 |
What moves the price most:
- Brick matching
- Whether building regulations apply
- Moving meters, drains or the doorbell and lighting
- Size and roof style
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a porch in Canterbury?
Whether you need planning permission depends on your house and its location in England. In England a porch is permitted development if its ground floor area is no more than 3 square metres, no part is over 3 metres high and it is at least 2 metres from a boundary next to a road.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Design to match the house
- Plastering and decoration
- Roof and guttering
- Electrics for lighting
- Front door and windows
- Foundations and brickwork
How long does it take?
Expect 2 to 4 weeks on site. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Canterbury
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
From CT1 outwards, we take on projects throughout Canterbury and the surrounding parts of Kent.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about porches in Canterbury
Do I need planning permission for a porch?
In England a porch is permitted development if its ground floor area is no more than 3 square metres, no part is higher than 3 metres and it is at least 2 metres from any boundary next to a road. Larger porches need an application.
How much does a porch cost in Canterbury?
In Canterbury, a porch typically costs £7,250–£18,000 from a 3 m² porch to a small front extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Does a porch need building regulations?
In England and Wales a ground-level porch under 30 square metres is usually exempt if the front door stays in place and the glazing meets safety standards. In Scotland the exemption is much smaller (around 8 square metres, with no new opening into the house). If the front door is removed, approval is needed. We check this for your design.
Can you move the gas or electric meter?
Meters belong to the supplier or network operator. We coordinate their move as part of the job, which can add time.
How long does a porch take in Canterbury?
Typically 2 to 4 weeks on site. Design and approvals beforehand usually take 6 to 12 weeks.
