What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Canterbury?
In Canterbury, a single-storey extension typically costs £2,200–£3,250 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £44,000–£65,000. That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £31,000–£45,500 |
| Typical project (20 m²) | £44,000–£65,000 |
| Larger project (28 m²) | £61,500–£91,000 |
| Rate per m² | £2,200–£3,250 |
Your quote will depend mainly on:
- Kitchen, flooring and finishes, which we can include or leave to you
- Floor area and the length of new wall
- How much of the existing house is opened up
- Ground conditions and foundation depth
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Canterbury?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a single-storey extension:
- Measured survey and design drawings
- Doors, windows and roof glazing installed
- First and second fix electrics, heating and plastering
- Cavity walls, insulation and roof to current building regulations
- Knock-through to the existing house with steel beams
- Structural calculations for steels and lintels
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Canterbury
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Projects in Canterbury (CT1) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Canterbury
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How long does a single-storey extension take in Canterbury?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How much does a single-storey extension cost in Canterbury?
In Canterbury, a single-storey extension typically costs £2,200–£3,250 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £44,000–£65,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.