What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Coleraine?
In Coleraine, a side extension typically costs £1,450–£2,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £40,500–£64,500. That range is adjusted for Northern Ireland, where domestic building work typically costs around 14% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £29,000–£46,000 |
| Typical project (28 m²) | £40,500–£64,500 |
| Larger project (39 m²) | £56,500–£89,500 |
| Rate per m² | £1,450–£2,300 |
The main things that change the cost:
- Internal fit-out of the new rooms
- Single or two storeys
- Steel work where the side wall is opened
- Drains, gas meters or soil pipes that need moving
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a side extension in Coleraine?
Approvals for a side extension in Coleraine follow the rules for Northern Ireland. In Northern Ireland a single-storey side extension can be permitted development if it is no more than 4 metres high, no wider than half the original house and not beside a wall facing a road. Side extensions of more than one storey need planning permission.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical side extension we handle:
- Structural calculations
- Electrics, heating and plastering
- Building control completion
- Walls, roof and windows to match the house
- Planning drawings and application
- Opening into the existing house
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Coleraine
Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.
Our Coleraine coverage includes postcode districts BT51 and BT52, and we also work in nearby places such as Limavady, Ballymena and Magherafelt.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Coleraine
Do I need planning permission for a side extension in Coleraine?
In Northern Ireland a single-storey side extension can be permitted development if it is no more than 4 metres high, no wider than half the original house and not beside a wall facing a road. Side extensions of more than one storey need planning permission.
Do you build side extensions in Coleraine?
Yes. We build side extensions across Coleraine, including postcodes BT51 and BT52. Every project starts with a free home visit.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.
How much does a side extension cost in Coleraine?
In Coleraine, a side extension typically costs £1,450–£2,300 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £40,500–£64,500. Your fixed price depends on the survey and drawings.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
