What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Newton Mearns?
In Newton Mearns, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500. Prices in Scotland sit near the national average for this kind of work, and the range for Newton Mearns reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £33,000–£51,000 |
| Typical project (28 m²) | £46,000–£71,500 |
| Larger project (39 m²) | £64,500–£99,500 |
| Rate per m² | £1,650–£2,550 |
What moves the price most:
- Drains, gas meters or soil pipes that need moving
- Internal fit-out of the new rooms
- Single or two storeys
- Steel work where the side wall is opened
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Newton Mearns?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Structural calculations
- Foundations and drainage alterations
- Survey of the boundary, drains and access
- Building control completion
- Planning drawings and application
- Electrics, heating and plastering
How long does it take?
Allow 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Newton Mearns
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Our Newton Mearns coverage includes postcode districts G77, and we also work in nearby places such as Barrhead, Paisley and Rutherglen.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Newton Mearns
How much does a side extension cost in Newton Mearns?
In Newton Mearns, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £46,000–£71,500. Your fixed price depends on the survey and drawings.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
Do I need planning permission for a side extension in Newton Mearns?
In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.
How long does a side extension take in Newton Mearns?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.