What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Teddington?
In Teddington, a side extension typically costs £2,200–£3,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £61,500–£96,500. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Teddington. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £44,000–£69,000 |
| Typical project (28 m²) | £61,500–£96,500 |
| Larger project (39 m²) | £86,000–£134,500 |
| Rate per m² | £2,200–£3,450 |
The main things that change the cost:
- Boundary walls and access for materials
- Steel work where the side wall is opened
- Roof design and tile matching
- Internal fit-out of the new rooms
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Teddington?
Here is how the rules work for a side extension in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Survey of the boundary, drains and access
- Building control completion
- Opening into the existing house
- Structural calculations
- Planning drawings and application
- Electrics, heating and plastering
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Teddington
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
From TW11 outwards, we take on projects throughout Teddington and the surrounding parts of Greater London.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Teddington
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
How much does a side extension cost in Teddington?
In Teddington, a side extension typically costs £2,200–£3,450 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £61,500–£96,500. Your fixed price depends on the survey and drawings.
Who approves a side extension in Teddington?
Planning matters in Teddington go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.