What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Coleraine?
In Coleraine, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £24,000–£34,000. That range is adjusted for Northern Ireland, where domestic building work typically costs around 14% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £16,000–£23,000 |
| Typical project (12 m²) | £24,000–£34,000 |
| Larger project (17 m²) | £34,000–£48,500 |
| Rate per m² | £2,000–£2,850 |
The biggest cost drivers are:
- Glazed roof specification
- Moving drains and soil stacks
- Agreements with neighbours on shared walls
- Access through the house for materials
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Coleraine?
The approval route for Coleraine is set by planning law in Northern Ireland. In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Written agreement with neighbours on shared walls
- Steel beams to remove the side wall
- Glazed or solid roof with insulation
- Foundations and drainage, including any build-over agreement
- Written agreement with neighbours on shared walls
- Drawings and planning or permitted development check
How long does it take?
Expect 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Coleraine
Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.
Our Coleraine coverage includes postcode districts BT51 and BT52, and we also work in nearby places such as Limavady, Ballymena and Magherafelt.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Coleraine
How much does a side return extension cost in Coleraine?
In Coleraine, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £24,000–£34,000. Your fixed price depends on the survey and drawings.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
Do you build side return extensions in Coleraine?
Yes. We build side return extensions across Coleraine, including postcodes BT51 and BT52. Every project starts with a free home visit.
Do I need planning permission for a side return extension in Coleraine?
In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.