What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Coleraine?
In Coleraine, a small housing development typically costs £1,550–£2,300 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £620,000–£920,000. The guide for Coleraine reflects typical costs in Northern Ireland, roughly 14% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £434,000–£644,000 |
| Typical project (400 m²) | £620,000–£920,000 |
| Larger project (560 m²) | £868,000–£1,288,000 |
| Rate per m² | £1,550–£2,300 |
Your quote will depend mainly on:
- Site access and phasing
- Specification
- Roads, sewers and adoption agreements
- Planning conditions and obligations
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a small housing development in Coleraine?
Whether you need planning permission depends on your house and its location in Northern Ireland. In Northern Ireland small schemes need planning permission and building control approval, with road adoption agreed with DfI Roads where relevant.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical small housing development we handle:
- Handover packs for each home
- External works and landscaping
- Groundworks, roads and drainage
- Warranty and building control inspections
- Pre-construction cost plan
- Utility connections
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Coleraine
Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.
From BT51 outwards, we take on projects throughout Coleraine and the surrounding parts of County Londonderry.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Coleraine
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
Do you build small housing developments in Coleraine?
Yes. We build small housing developments across Coleraine, including postcodes BT51 and BT52. Every project starts with a free home visit.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
Do I need planning permission for a small housing development in Coleraine?
In Northern Ireland small schemes need planning permission and building control approval, with road adoption agreed with DfI Roads where relevant.
How much does a small housing development cost in Coleraine?
In Coleraine, a small housing development typically costs £1,550–£2,300 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £620,000–£920,000. Your fixed price depends on the survey and drawings.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.