What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Omagh?
In Omagh, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £24,000–£34,000. We start from a UK-wide guide and adjust it for Northern Ireland, where labour and materials are typically about 14% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £16,000–£23,000 |
| Typical project (12 m²) | £24,000–£34,000 |
| Larger project (17 m²) | £34,000–£48,500 |
| Rate per m² | £2,000–£2,850 |
What moves the price most:
- Steel beams and propping of the back addition
- Moving drains and soil stacks
- Agreements with neighbours on shared walls
- Glazed roof specification
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Omagh?
Before anything is built in Omagh, we confirm which approvals apply in Northern Ireland. In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Glazed or solid roof with insulation
- Written agreement with neighbours on shared walls
- Drawings and planning or permitted development check
- Steel beams to remove the side wall
- Building control sign-off
- Floor levelling, heating and electrics
How long does it take?
Build time is typically 10 to 14 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Omagh
Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.
We work across Omagh and neighbouring areas such as Strabane, Enniskillen and Cookstown. Postcodes we cover in Omagh include BT78 and BT79.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side return extensions in Omagh
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
How much does a side return extension cost in Omagh?
In Omagh, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £24,000–£34,000. Your fixed price depends on the survey and drawings.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
Do I need planning permission for a side return extension in Omagh?
In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.
Who approves a side return extension in Omagh?
Planning matters in Omagh go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.