What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Fraserburgh?
In Fraserburgh, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £27,000–£38,500. Building costs in Scotland are close to the UK average, so the figures for Fraserburgh are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £18,000–£25,500 |
| Typical project (12 m²) | £27,000–£38,500 |
| Larger project (17 m²) | £38,000–£54,500 |
| Rate per m² | £2,250–£3,200 |
What moves the price most:
- Length of the side return
- Moving drains and soil stacks
- Agreements with neighbours on shared walls
- Steel beams and propping of the back addition
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Fraserburgh?
Approvals for a side return extension in Fraserburgh follow the rules for Scotland. In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical side return extension we handle:
- Glazed or solid roof with insulation
- Written agreement with neighbours on shared walls
- Drawings and planning or permitted development check
- Floor levelling, heating and electrics
- Foundations and drainage, including any build-over agreement
- Written agreement with neighbours on shared walls
How long does it take?
Build time is typically 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Fraserburgh
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
If your home is in Fraserburgh or close by in Peterhead, Inverurie and Aberdeen, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Fraserburgh
Do you build side return extensions in Fraserburgh?
Yes. We build side return extensions across Fraserburgh, including postcodes AB43. Every project starts with a free home visit.
How much does a side return extension cost in Fraserburgh?
In Fraserburgh, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £27,000–£38,500. Your fixed price depends on the survey and drawings.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
Do I need planning permission for a side return extension in Fraserburgh?
In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.