What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Belfast?
In Belfast, a single-storey extension typically costs £1,700–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £34,000–£50,000. The guide for Belfast reflects typical costs in Northern Ireland, roughly 14% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £24,000–£35,000 |
| Typical project (20 m²) | £34,000–£50,000 |
| Larger project (28 m²) | £47,500–£70,000 |
| Rate per m² | £1,700–£2,500 |
Your quote will depend mainly on:
- Floor area and the length of new wall
- Kitchen, flooring and finishes, which we can include or leave to you
- Ground conditions and foundation depth
- Roof type and the size of any lantern or roof windows
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Belfast?
Approvals for a single-storey extension in Belfast follow the rules for Northern Ireland. In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Doors, windows and roof glazing installed
- Foundations, drainage and any build-over agreement
- Measured survey and design drawings
- Structural calculations for steels and lintels
- Cavity walls, insulation and roof to current building regulations
- Knock-through to the existing house with steel beams
How long does it take?
Allow 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Belfast
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
From BT1 outwards, we take on projects throughout Belfast and the surrounding parts of County Antrim.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Belfast
How much does a single-storey extension cost in Belfast?
In Belfast, a single-storey extension typically costs £1,700–£2,500 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £34,000–£50,000. Your fixed price depends on the survey and drawings.
Do you build single-storey extensions in Belfast?
Yes. We build single-storey extensions across Belfast, including postcodes BT1, BT2, BT3 and BT4. Every project starts with a free home visit.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.
Do I need planning permission for a single-storey extension in Belfast?
In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.