County AntrimSingle-storey extensions

Single-storey extensions in Newtownabbey

Thinking about a single-storey extension in Newtownabbey? We can take it from first ideas to finished, signed-off work, with a written programme before work starts.

Guide price in Newtownabbey

£1,700–£2,500 per m² of floor area

In Newtownabbey, a single-storey extension typically costs £1,700–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £34,000–£50,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a single-storey extension?

Single-storey rear extension with bifold doors open onto a patio and a glass roof lantern

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.

How much does a single-storey extension cost in Newtownabbey?

In Newtownabbey, a single-storey extension typically costs £1,700–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £34,000–£50,000. Building costs in Northern Ireland run about 14% below the UK average, and the figures for Newtownabbey are adjusted to reflect that. Design, structural calculations and council fees are extra.

Guide prices for Newtownabbey, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (14 m²)£24,000–£35,000
Typical project (20 m²)£34,000–£50,000
Larger project (28 m²)£47,500–£70,000
Rate per m²£1,700–£2,500

The biggest cost drivers are:

  • Kitchen, flooring and finishes, which we can include or leave to you
  • Ground conditions and foundation depth
  • Roof type and the size of any lantern or roof windows
  • How much of the existing house is opened up

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a single-storey extension in Newtownabbey?

Approvals for a single-storey extension in Newtownabbey follow the rules for Northern Ireland. In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.

In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

The work we manage on a single-storey extension:

  • Structural calculations for steels and lintels
  • Cavity walls, insulation and roof to current building regulations
  • Building control inspections and completion certificate
  • First and second fix electrics, heating and plastering
  • Doors, windows and roof glazing installed
  • Knock-through to the existing house with steel beams

How long does it take?

Build time is typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Newtownabbey

Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.

Newtownabbey sits in County Antrim, about 4 miles north of Belfast. We cover the whole of Newtownabbey, including postcodes BT36 and BT37.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about single-storey extensions in Newtownabbey

Can I stay in the house during the build?

Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.

Do I need planning permission for a single-storey extension in Newtownabbey?

In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.

How much does a single-storey extension cost in Newtownabbey?

In Newtownabbey, a single-storey extension typically costs £1,700–£2,500 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £34,000–£50,000. Your fixed price depends on the survey and drawings.

Is VAT charged on an extension?

Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.

What is a build-over agreement?

If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.

How long does a single-storey extension take in Newtownabbey?

Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.

Ready to talk about a single-storey extension in Newtownabbey? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.