What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Carrickfergus?
In Carrickfergus, a single-storey extension typically costs £1,700–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £34,000–£50,000. We start from a UK-wide guide and adjust it for Northern Ireland, where labour and materials are typically about 14% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £24,000–£35,000 |
| Typical project (20 m²) | £34,000–£50,000 |
| Larger project (28 m²) | £47,500–£70,000 |
| Rate per m² | £1,700–£2,500 |
The biggest cost drivers are:
- How much of the existing house is opened up
- Floor area and the length of new wall
- Kitchen, flooring and finishes, which we can include or leave to you
- Ground conditions and foundation depth
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in Carrickfergus?
Approvals for a single-storey extension in Carrickfergus follow the rules for Northern Ireland. In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most single-storey extensions:
- Foundations, drainage and any build-over agreement
- Structural calculations for steels and lintels
- Building control inspections and completion certificate
- Cavity walls, insulation and roof to current building regulations
- Measured survey and design drawings
- Doors, windows and roof glazing installed
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Carrickfergus
Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.
From BT38 outwards, we take on projects throughout Carrickfergus and the surrounding parts of County Antrim.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about single-storey extensions in Carrickfergus
How much does a single-storey extension cost in Carrickfergus?
In Carrickfergus, a single-storey extension typically costs £1,700–£2,500 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £34,000–£50,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a single-storey extension in Carrickfergus?
In Northern Ireland the Planning (General Permitted Development) Order (Northern Ireland) 2015 allows single-storey rear extensions of up to 3 metres on attached houses and 4 metres on detached houses, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary. Houses with removed rights need planning permission, listed buildings need consent, and in conservation areas extensions must stay single-storey and must not come forward of the front or side walls.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How long does a single-storey extension take in Carrickfergus?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
