What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Bonnyrigg?
In Bonnyrigg, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £38,000–£56,000. Building costs in Scotland are close to the UK average, so the figures for Bonnyrigg are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £26,500–£39,000 |
| Typical project (20 m²) | £38,000–£56,000 |
| Larger project (28 m²) | £53,000–£78,500 |
| Rate per m² | £1,900–£2,800 |
Your quote will depend mainly on:
- How much of the existing house is opened up
- Roof type and the size of any lantern or roof windows
- Ground conditions and foundation depth
- Floor area and the length of new wall
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Bonnyrigg?
Before anything is built in Bonnyrigg, we confirm which approvals apply in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- First and second fix electrics, heating and plastering
- Foundations, drainage and any build-over agreement
- Structural calculations for steels and lintels
- Doors, windows and roof glazing installed
- Cavity walls, insulation and roof to current building regulations
- Knock-through to the existing house with steel beams
How long does it take?
Allow 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Bonnyrigg
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Our Bonnyrigg coverage includes postcode districts EH19, and we also work in nearby places such as Musselburgh, Penicuik and Broxburn.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Bonnyrigg
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
How much does a single-storey extension cost in Bonnyrigg?
In Bonnyrigg, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £38,000–£56,000. Your fixed price depends on the survey and drawings.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
Do I need planning permission for a single-storey extension in Bonnyrigg?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Who approves a single-storey extension in Bonnyrigg?
Planning matters in Bonnyrigg go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.