What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Bonnyrigg?
In Bonnyrigg, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000. Prices in Scotland sit near the national average for this kind of work, and the range for Bonnyrigg reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £43,000–£62,000 |
| Typical project (28 m²) | £60,000–£87,000 |
| Larger project (39 m²) | £84,000–£121,000 |
| Rate per m² | £2,150–£3,100 |
Your quote will depend mainly on:
- Steelwork and propping of the existing house
- Access for materials on terraced streets
- Total footprint and the amount of glazing
- Agreements with neighbours on shared walls
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a wraparound extension in Bonnyrigg?
Before anything is built in Bonnyrigg, we confirm which approvals apply in Scotland. In Scotland a wraparound extension normally needs planning permission and a building warrant.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a wraparound extension:
- Design and planning application
- Written agreement with neighbours on shared walls
- Building control completion
- Walls, roof and glazing
- Structural engineer’s design for steels and supports
- Removal of internal and external walls
How long does it take?
The build itself usually takes 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Bonnyrigg
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
If your home is in Bonnyrigg or close by in Musselburgh, Penicuik and Broxburn, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about wraparound extensions in Bonnyrigg
Who approves a wraparound extension in Bonnyrigg?
Planning matters in Bonnyrigg go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
How much does a wraparound extension cost in Bonnyrigg?
In Bonnyrigg, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £60,000–£87,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a wraparound extension in Bonnyrigg?
In Scotland a wraparound extension normally needs planning permission and a building warrant.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
