What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Canterbury?
In Canterbury, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £68,500–£101,000. The guide for Canterbury reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £49,000–£72,000 |
| Typical project (28 m²) | £68,500–£101,000 |
| Larger project (39 m²) | £95,500–£140,500 |
| Rate per m² | £2,450–£3,600 |
Your quote will depend mainly on:
- Kitchen and flooring specification
- Party wall surveyor fees for one or both neighbours
- Steelwork and propping of the existing house
- Total footprint and the amount of glazing
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a wraparound extension in Canterbury?
Whether you need planning permission depends on your house and its location in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Removal of internal and external walls
- Party wall notices and surveyor liaison
- Structural engineer’s design for steels and supports
- Foundations and drainage
- Underfloor heating option, electrics and plastering
- Walls, roof and glazing
How long does it take?
The build itself usually takes 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Canterbury
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
We work across Canterbury and neighbouring areas such as Whitstable, Herne Bay and Faversham. Postcodes we cover in Canterbury include CT1.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about wraparound extensions in Canterbury
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How much does a wraparound extension cost in Canterbury?
In Canterbury, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £68,500–£101,000. Your fixed price depends on the survey and drawings.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
How long does a wraparound extension take in Canterbury?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.