What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Houghton-Le-Spring?
In Houghton-Le-Spring, a single-storey extension typically costs £1,750–£2,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £35,000–£52,000. Building costs in the North East run about 10% below the UK average, and the figures for Houghton-Le-Spring are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £24,500–£36,500 |
| Typical project (20 m²) | £35,000–£52,000 |
| Larger project (28 m²) | £49,000–£73,000 |
| Rate per m² | £1,750–£2,600 |
What moves the price most:
- Floor area and the length of new wall
- Ground conditions and foundation depth
- Kitchen, flooring and finishes, which we can include or leave to you
- Glazing: sliding and bifold doors cost more than French doors
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in Houghton-Le-Spring?
Before anything is built in Houghton-Le-Spring, we confirm which approvals apply in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- First and second fix electrics, heating and plastering
- Cavity walls, insulation and roof to current building regulations
- Knock-through to the existing house with steel beams
- Foundations, drainage and any build-over agreement
- Building control inspections and completion certificate
- Structural calculations for steels and lintels
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Houghton-Le-Spring
The North East has many terraced streets and post-war semis, where rear extensions and loft conversions are popular ways to gain space.
If your home is in Houghton-Le-Spring or close by in Chester-le-Street, Washington and Seaham, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Houghton-Le-Spring
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
How long does a single-storey extension take in Houghton-Le-Spring?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
How much does a single-storey extension cost in Houghton-Le-Spring?
In Houghton-Le-Spring, a single-storey extension typically costs £1,750–£2,600 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £35,000–£52,000. Your fixed price depends on the survey and drawings.
