What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Aberdeen and Grampian?
In Aberdeen and Grampian, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Building costs in Scotland are close to the UK average, so the figures for Aberdeen and Grampian are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
Your quote will depend mainly on:
- Planning conditions and obligations
- Site access and phasing
- Roads, sewers and adoption agreements
- Number and size of homes
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a small housing development in Aberdeen and Grampian?
Before anything is built in Aberdeen and Grampian, we confirm which approvals apply in Scotland. In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical small housing development we handle:
- Handover packs for each home
- Groundworks, roads and drainage
- Warranty and building control inspections
- Pre-construction cost plan
- External works and landscaping
- House construction to building regulations
How long does it take?
Expect 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Aberdeen and Grampian
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Towns we cover in Aberdeen and Grampian include Aberdeen, Elgin, Peterhead, Inverurie, Fraserburgh and Westhill.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Aberdeen and Grampian
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
How much does a small housing development cost in Aberdeen and Grampian?
In Aberdeen and Grampian, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a small housing development in Aberdeen and Grampian?
In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
Who approves a small housing development in Aberdeen and Grampian?
Planning matters in Aberdeen and Grampian go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.