What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Aberdeen?
In Aberdeen, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Prices in Scotland sit near the national average for this kind of work, and the range for Aberdeen reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
The biggest cost drivers are:
- Planning conditions and obligations
- Ground conditions
- Site access and phasing
- Roads, sewers and adoption agreements
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Aberdeen?
Here is how the rules work for a small housing development in Scotland. In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
What we take care of:
- Pre-construction cost plan
- Utility connections
- Warranty and building control inspections
- Groundworks, roads and drainage
- External works and landscaping
- Handover packs for each home
How long does it take?
Build time is typically 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Aberdeen
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Our Aberdeen coverage includes postcode districts AB10, AB11, AB12 and AB15, and we also work in nearby places such as Westhill, Stonehaven and Inverurie.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Aberdeen
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
How much does a small housing development cost in Aberdeen?
In Aberdeen, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
Do you build small housing developments in Aberdeen?
Yes. We build small housing developments across Aberdeen, including postcodes AB10, AB11, AB12 and AB15. Every project starts with a free home visit.
Do I need planning permission for a small housing development in Aberdeen?
In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.