What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Dunoon?
In Dunoon, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
The biggest cost drivers are:
- Roads, sewers and adoption agreements
- Specification
- Planning conditions and obligations
- Ground conditions
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a small housing development in Dunoon?
Here is how the rules work for a small housing development in Scotland. In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most small housing developments:
- House construction to building regulations
- Utility connections
- Warranty and building control inspections
- Handover packs for each home
- External works and landscaping
- Pre-construction cost plan
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Dunoon
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Projects in Dunoon are taken on by arrangement. We confirm availability first, and any travel or accommodation costs are shown separately in the quote.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Dunoon
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
How much does a small housing development cost in Dunoon?
In Dunoon, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a small housing development in Dunoon?
In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
Who approves a small housing development in Dunoon?
Planning matters in Dunoon go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.