What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Hastings?
In Hastings, a small housing development typically costs £2,000–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £800,000–£1,200,000. The guide for Hastings reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £560,000–£840,000 |
| Typical project (400 m²) | £800,000–£1,200,000 |
| Larger project (560 m²) | £1,120,000–£1,680,000 |
| Rate per m² | £2,000–£3,000 |
The biggest cost drivers are:
- Planning conditions and obligations
- Site access and phasing
- Number and size of homes
- Specification
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Hastings?
The approval route for Hastings is set by planning law in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most small housing developments:
- Utility connections
- Groundworks, roads and drainage
- Warranty and building control inspections
- Handover packs for each home
- House construction to building regulations
- Design development and discharge of conditions
How long does it take?
Expect 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Hastings
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Projects in Hastings (TN34) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Hastings
Who approves a small housing development in Hastings?
Planning matters in Hastings go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
What about biodiversity net gain?
In England, biodiversity net gain rules apply to many developments, with exemptions for some small sites. We work with your ecologist to confirm what applies to your scheme.
How much does a small housing development cost in Hastings?
In Hastings, a small housing development typically costs £2,000–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £800,000–£1,200,000. Your fixed price depends on the survey and drawings.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.