We take on new build homes in Hastings, about 32 miles east of Brighton, starting with a free look at the site and a clear view of the approvals needed.

Guide price in Hastings

£2,250–£3,600 per m² of floor area (build cost)

In Hastings, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a new build home?

Newly completed contemporary detached house in brick, render and timber cladding

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.

How much does a new build home cost in Hastings?

In Hastings, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £337,500–£540,000. The guide for Hastings reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for Hastings, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (105 m²)£236,000–£378,000
Typical project (150 m²)£337,500–£540,000
Larger project (210 m²)£472,500–£756,000
Rate per m²£2,250–£3,600

The biggest cost drivers are:

  • Specification and energy systems
  • Services connections
  • External works and landscaping
  • Size and complexity of the house

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a new build home in Hastings?

Whether you need planning permission depends on your house and its location in England. In England a new home needs full planning permission (or permission in principle followed by technical details consent). Councils assess design, access, neighbours and drainage, and the Community Infrastructure Levy may apply, though self-builders can claim an exemption before starting.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

We check this for your address before design work starts, so there are no surprises later.

What we handle

The work we manage on a new build home:

  • Site appraisal and feasibility
  • Structural and services design
  • Design and planning application
  • Internal fit-out and finishes
  • Building control completion and warranty liaison
  • Superstructure, roof and windows

How long does it take?

Build time is typically 9 to 14 months on site for a typical house. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.

Building in Hastings

Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.

If your home is in Hastings or close by in Bexhill-on-Sea, Hailsham and Eastbourne, a free home visit is the first step.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about new build homes in Hastings

How much does a new build home cost in Hastings?

In Hastings, a new build home typically costs £2,250–£3,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £337,500–£540,000. Your fixed price depends on the survey and drawings.

How long does a new build take?

A typical house takes 9 to 14 months on site after approvals.

Is VAT charged on building a new house?

Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.

Who approves a new build home in Hastings?

Planning matters in Hastings go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

Can you build to my architect’s design?

Yes. We price and build from your drawings, or we can manage the design for you.

Get a free, no-obligation home visit for your new build home in Hastings.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price