What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Southall?
In Southall, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £940,000–£1,400,000. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Southall. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £658,000–£980,000 |
| Typical project (400 m²) | £940,000–£1,400,000 |
| Larger project (560 m²) | £1,316,000–£1,960,000 |
| Rate per m² | £2,350–£3,500 |
The main things that change the cost:
- Planning conditions and obligations
- Number and size of homes
- Site access and phasing
- Ground conditions
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Southall?
Whether you need planning permission depends on your house and its location in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- House construction to building regulations
- Warranty and building control inspections
- External works and landscaping
- Handover packs for each home
- Pre-construction cost plan
- Utility connections
How long does it take?
Expect 12 to 24 months depending on scheme size. Allow time beforehand for drawings and approvals, usually 6 to 12 months.
Building in Southall
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
Southall sits in Greater London, about 10 miles west of central London. We cover the whole of Southall, including postcodes UB1.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Southall
How much does a small housing development cost in Southall?
In Southall, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £940,000–£1,400,000. Your fixed price depends on the survey and drawings.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
Who approves a small housing development in Southall?
Planning matters in Southall go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
