What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Morden?
In Morden, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Building costs in London run about 30% above the UK average, and the figures for Morden are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £5,750–£12,500 |
| Higher specification | £12,500–£15,500 |
Your quote will depend mainly on:
- Party wall involvement
- Flush or downstand beam
- Moving radiators, sockets and pipes
- Floor and ceiling repairs
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a structural alteration in Morden?
The approval route for Morden is set by planning law in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Building control sign-off
- Temporary propping
- Steel beam supply and installation on padstones
- Structural engineer’s calculations and drawings
- Making good, plastering and flooring repairs
- Building control application
How long does it take?
Expect 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Morden
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
Projects in Morden (SM4) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about structural alterations in Morden
Who approves a structural alteration in Morden?
Planning matters in Morden go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How do I know if a wall is load-bearing?
Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.
How long does a knock-through take?
Usually 1 to 2 weeks on site, plus a few days for plastering to dry.
How much does a structural alteration cost in Morden?
In Morden, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Do I need a party wall notice?
In England and Wales, if the beam sits in a party wall, yes.