What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in New Malden?
In New Malden, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £5,750–£12,500 |
| Higher specification | £12,500–£15,500 |
Your quote will depend mainly on:
- Span of the opening
- Moving radiators, sockets and pipes
- Flush or downstand beam
- Party wall involvement
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a structural alteration in New Malden?
Whether you need planning permission depends on your house and its location in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical structural alteration we handle:
- Building control sign-off
- Temporary propping
- Structural engineer’s calculations and drawings
- Fire protection to the steel
- Making good, plastering and flooring repairs
- Steel beam supply and installation on padstones
How long does it take?
Allow 1 to 2 weeks on site for a typical knock-through. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in New Malden
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
New Malden sits in Greater London, about 9 miles south-west of central London. We cover the whole of New Malden, including postcodes KT3.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about structural alterations in New Malden
How much does a structural alteration cost in New Malden?
In New Malden, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Who approves a structural alteration in New Malden?
Planning matters in New Malden go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
What fire protection does a steel need?
Usually fire-rated plasterboard or intumescent paint, as building control requires.
Do I need a party wall notice?
In England and Wales, if the beam sits in a party wall, yes.
Can the beam be hidden?
Often, by setting it within the ceiling depth. It depends on the joists and span.