What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in the Scottish Borders?
In the Scottish Borders, a structural alteration typically costs £4,250–£9,250 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Building costs in Scotland are close to the UK average, so the figures for the Scottish Borders are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £4,250–£9,250 |
| Higher specification | £9,250–£11,500 |
What moves the price most:
- Span of the opening
- Floor and ceiling repairs
- What sits above the wall
- Moving radiators, sockets and pipes
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a structural alteration in the Scottish Borders?
Here is how the rules work for a structural alteration in Scotland. In Scotland removing a load-bearing wall needs a building warrant before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most structural alterations:
- Written agreement with neighbours on shared walls
- Steel beam supply and installation on padstones
- Building control sign-off
- Structural engineer’s calculations and drawings
- Building control application
- Temporary propping
How long does it take?
The build itself usually takes 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in the Scottish Borders
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Towns we cover in the Scottish Borders include Hawick, Galashiels, Peebles, Kelso and Selkirk.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about structural alterations in the Scottish Borders
Do I need planning permission for a structural alteration in the Scottish Borders?
In Scotland removing a load-bearing wall needs a building warrant before work starts.
Can the beam be hidden?
Often, by setting it within the ceiling depth. It depends on the joists and span.
What fire protection does a steel need?
Usually fire-rated plasterboard or intumescent paint, as building control requires.
How much does a structural alteration cost in the Scottish Borders?
In the Scottish Borders, a structural alteration typically costs £4,250–£9,250 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How long does a structural alteration take in the Scottish Borders?
Typically 1 to 2 weeks on site for a typical knock-through. Design and approvals beforehand usually take 6 to 12 weeks.
How do I know if a wall is load-bearing?
Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.