What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Broadstairs?
In Broadstairs, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £68,500–£101,000. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Broadstairs. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £49,000–£72,000 |
| Typical project (28 m²) | £68,500–£101,000 |
| Larger project (39 m²) | £95,500–£140,500 |
| Rate per m² | £2,450–£3,600 |
What moves the price most:
- Total footprint and the amount of glazing
- Steelwork and propping of the existing house
- Kitchen and flooring specification
- Drainage changes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in Broadstairs?
Before anything is built in Broadstairs, we confirm which approvals apply in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a wraparound extension:
- Underfloor heating option, electrics and plastering
- Party wall notices and surveyor liaison
- Foundations and drainage
- Structural engineer’s design for steels and supports
- Removal of internal and external walls
- Building control completion
How long does it take?
Build time is typically 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Broadstairs
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
From CT10 outwards, we take on projects throughout Broadstairs and the surrounding parts of Kent.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about wraparound extensions in Broadstairs
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How much does a wraparound extension cost in Broadstairs?
In Broadstairs, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £68,500–£101,000. Your fixed price depends on the survey and drawings.
How long does a wraparound extension take in Broadstairs?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.