A wraparound extension in March starts with understanding the house: its age, its structure and its plot. We survey, design, apply for approvals and build, all under one contract.

Guide price in March

£2,350–£3,400 per m² of floor area

In March, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £66,000–£95,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a wraparound extension?

L-shaped wraparound extension with a frameless glass corner and steel-look doors on a London terrace

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.

How much does a wraparound extension cost in March?

In March, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £66,000–£95,000. Building costs in the East of England run about 6% above the UK average, and the figures for March are adjusted to reflect that. Design, structural calculations and council fees are extra.

Guide prices for March, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£47,000–£68,000
Typical project (28 m²)£66,000–£95,000
Larger project (39 m²)£91,500–£132,500
Rate per m²£2,350–£3,400

The main things that change the cost:

  • Drainage changes
  • Total footprint and the amount of glazing
  • Steelwork and propping of the existing house
  • Kitchen and flooring specification

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a wraparound extension in March?

Before anything is built in March, we confirm which approvals apply in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

The work we manage on a wraparound extension:

  • Underfloor heating option, electrics and plastering
  • Party wall notices and surveyor liaison
  • Walls, roof and glazing
  • Design and planning application
  • Foundations and drainage
  • Structural engineer’s design for steels and supports

How long does it take?

Allow 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.

Building in March

Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.

March sits in Cambridgeshire, about 24 miles north of Cambridge. We cover the whole of March, including postcodes PE15.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about wraparound extensions in March

What about the old back addition?

The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.

Is a wraparound worth it?

It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.

How much does a wraparound extension cost in March?

In March, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £66,000–£95,000. Your fixed price depends on the survey and drawings.

How long does it take to build?

Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.

Do you build wraparound extensions in March?

Yes. We build wraparound extensions across March, including postcodes PE15. Every project starts with a free home visit.