What is a kitchen extension?

A kitchen extension is an extension designed around a new kitchen, usually an open-plan kitchen, dining and family space at the back of the house. We build the extension and fit the kitchen as one project, so plumbing, electrics and lighting are planned around the layout from the start.
How much does a kitchen extension cost in March?
In March, a kitchen extension typically costs £2,400–£3,600 per m² including a mid-range kitchen, including VAT at 20% (standard rate). For a typical 22 m² project that is roughly £53,000–£79,000. Building costs in the East of England run about 6% above the UK average, and the figures for March are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (15 m²) | £36,000–£54,000 |
| Typical project (22 m²) | £53,000–£79,000 |
| Larger project (31 m²) | £74,500–£111,500 |
| Rate per m² | £2,400–£3,600 |
Your quote will depend mainly on:
- Kitchen units, worktops and appliances
- Underfloor heating and flooring
- Who supplies the kitchen
- Extension size and roof design
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a kitchen extension in March?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a kitchen extension:
- Kitchen fitting, worktops and splashbacks
- Building control sign-off
- Drainage and water supply positioned for the sink and appliances
- Flooring and decoration
- Kitchen layout planned alongside the extension design
- Extraction ducted to outside
How long does it take?
Allow 11 to 16 weeks on site, including kitchen fitting. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in March
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
If your home is in March or close by in Wisbech, Ely and Peterborough, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about kitchen extensions in March
Will I need planning permission?
The same rules apply as for any extension. Many single-storey kitchen extensions are permitted development; larger or wraparound designs need an application.
Is underfloor heating worth it?
In a large open-plan space it frees wall space for units and glazing and gives even heat. It is easiest to fit during the build.
How long does a kitchen extension take in March?
Typically 11 to 16 weeks on site, including kitchen fitting. Design and approvals beforehand usually take 6 to 12 weeks.
How much does a kitchen extension cost in March?
In March, a kitchen extension typically costs £2,400–£3,600 per m² including a mid-range kitchen, including VAT at 20% (standard rate). A typical 22 m² project comes to roughly £53,000–£79,000. Your fixed price depends on the survey and drawings.
Should the kitchen be designed before the extension?
Yes. Knowing where the sink, hob and island will go lets us place drains, ducting, sockets and windows correctly during the build.