Looking for a builder for a side return extension in March? We design and build side return extensions across Cambridgeshire, covering postcodes such as PE15.

Guide price in March

£2,450–£3,500 per m² of floor area

In March, a side return extension typically costs £2,450–£3,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £29,500–£42,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side return extension?

Kitchen-diner in a Victorian terrace with a long sloping glass roof along the side return

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.

How much does a side return extension cost in March?

In March, a side return extension typically costs £2,450–£3,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £29,500–£42,000. The guide for March reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for March, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (8 m²)£19,500–£28,000
Typical project (12 m²)£29,500–£42,000
Larger project (17 m²)£41,500–£59,500
Rate per m²£2,450–£3,500

What moves the price most:

  • Steel beams and propping of the back addition
  • Party wall surveyor fees
  • Access through the house for materials
  • Length of the side return

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a side return extension in March?

Before anything is built in March, we confirm which approvals apply in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

We check this for your address before design work starts, so there are no surprises later.

What we handle

What we take care of:

  • Drawings and planning or permitted development check
  • Building control sign-off
  • Party wall advice and notices
  • Glazed or solid roof with insulation
  • Foundations and drainage, including any build-over agreement
  • Steel beams to remove the side wall

How long does it take?

Build time is typically 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.

Building in March

Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.

We work across March and neighbouring areas such as Wisbech, Ely and Peterborough. Postcodes we cover in March include PE15.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about side return extensions in March

How do you get materials in?

Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.

Who approves a side return extension in March?

Planning matters in March go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

Is a glass roof too hot or cold?

Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.

How much does a side return extension cost in March?

In March, a side return extension typically costs £2,450–£3,500 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £29,500–£42,000. Your fixed price depends on the survey and drawings.

Can I stay in the house?

Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.

Tell us about your project in March and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.