SK Developments Free home visit0800 088 6248 Get a quote

Scottish BordersArchitectural design and drawings

Architectural design and drawings in Hawick

For homeowners in Hawick, about 13 miles south of Galashiels, we handle architectural drawings as a standalone service or as the first stage of a design and build project.

Guide price in Hawick

£1,500–£4,250 for planning and building regulations drawings for a typical extension

In Hawick, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a set of architectural drawings?

Extension drawings and a floor plan on a desk with a scale ruler and a white model house

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.

How much does a set of architectural drawings cost in Hawick?

In Hawick, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Prices in Scotland sit near the national average for this kind of work, and the range for Hawick reflects that. Council application fees are extra.

Guide prices for Hawick, including VAT at 20% (standard rate)
Size or typeGuide range
Planning and building regulations drawings for a typical extension£1,500–£4,250
Larger or more complex projects£4,250–£5,250

What moves the price most:

  • Project size and complexity
  • Planning or building regulations stage
  • 3D visuals
  • Measured survey complexity

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Planning and building regulations in Hawick

Here is how the rules work for a set of architectural drawings in Scotland. In Scotland drawings are prepared for the planning application and the building warrant, which must be granted before work starts.

Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

Handled as part of most architectural drawings:

  • Measured survey of the existing house
  • Tender-ready drawing pack
  • Design options and sketch layouts
  • Building regulations drawings and specification
  • Planning drawings: plans, elevations, site and location plans
  • 3D views on request

How long does it take?

Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.

Building in Hawick

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

Our Hawick coverage includes postcode districts TD9, and we also work in nearby places such as Selkirk, Galashiels and Kelso.

How it works

  1. 01

    Survey and brief

    We visit, talk through what you want and record the existing building.

  2. 02

    Concept design

    Options for layout and appearance, revised until you are happy.

  3. 03

    Drawings and documents

    The drawings and forms the council and building control need.

  4. 04

    Approval

    We follow the application through to a decision and pass on the approved drawings.

Questions about architectural drawings in Hawick

Can I use the drawings with another builder?

Yes. Drawings you pay for are yours to use for the project.

Do you prepare architectural drawings in Hawick?

Yes. We prepare architectural drawings across Hawick, including postcodes TD9. Every project starts with a free home visit.

How much does a set of architectural drawings cost in Hawick?

In Hawick, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Do you prepare structural calculations?

We coordinate a chartered structural engineer for calculations and beam designs.

How long do drawings take?

Typically 2 to 6 weeks from survey, depending on revisions.

Get a free, no-obligation home visit for your set of architectural drawings in Hawick.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price