What is a set of architectural drawings?

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.
How much does a set of architectural drawings cost in Surrey?
In Surrey, a set of architectural drawings typically costs £1,750–£5,000 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Planning and building regulations drawings for a typical extension | £1,750–£5,000 |
| Larger or more complex projects | £5,000–£6,250 |
The main things that change the cost:
- Project size and complexity
- Structural engineer’s fees
- 3D visuals
- Measured survey complexity
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Surrey
The approval route for Surrey is set by planning law in England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a set of architectural drawings:
- Structural calculations coordinated
- Planning drawings: plans, elevations, site and location plans
- Building regulations drawings and specification
- Party wall drawings where needed
- Design options and sketch layouts
- Measured survey of the existing house
How long does it take?
Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Surrey
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Towns we cover in Surrey include Woking, Guildford, Esher, Redhill, Staines and Banstead.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about architectural drawings in Surrey
Do you prepare structural calculations?
We coordinate a chartered structural engineer for calculations and beam designs.
Do you prepare architectural drawings in Surrey?
Yes. We prepare architectural drawings across Surrey, including postcodes CR3, CR5, CR6, GU1 and GU10. Every project starts with a free home visit.
How long do drawings take?
Typically 2 to 6 weeks from survey, depending on revisions.
Do I need an architect?
Not necessarily. For extensions and lofts, an architectural technician’s drawings are common. For complex or sensitive sites, an architect may be better.
How much does a set of architectural drawings cost in Surrey?
In Surrey, a set of architectural drawings typically costs £1,750–£5,000 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
